Level 2: Reservoir Eng 8: Cased Hole Logging

Reference
l2chl23

Objective

At the end of this course, students will be able to read a cementation/Casing evaluation log and give interpretations and hypotheses on the production logs

for producing or stationary wells. Have an initiation on the jobs of perforation and Pressure control Equipemts.

---------------------------------

Content

Jour 1:        Introduction to Production logging

PVT- TEMPERATURE-FLOW METER

VELOCITY – HOLDUPS-VSLIP

FLOW RATES

IDENTIFICATION TOOLS

Jour 2:   Introduction to CASED HOLE LOGGING

    CEMENT EVALUATION

    CASING CORROSION AND INSPECTION

    MECHANICAL SERVICES

    RADIATION AND EXPLOSIVES

Jour 3:      Introduction to logs and interpretation

    PRESSURE CONTROL EQUIPMENT 

    PERFORATION SERVICES AND ALL RELATED SERVICES

    PRACTICAL ON LOG READING AND CURVES EXPLANATIONS